1, the staff should close the bulk cement tank gate after using the forced concret mixer on the same day, convey all the cement in the spiral pipe, and do not leave any cement in the pipe. At the same time, clean the machinery and the site thoroughly.
2, the concrete in the mixing drum of the forced mixer must be cleaned. Maintain the machinery, add lubricant to each lubrication point, and apply oil to protect the parts to prevent rust.
3.Clean all parts of the forced mixer slurry, ash accumulation. Clean the dust, concrete and oil stains in the mixing tank and the surface of the whole machine in time to prevent the concrete from drying out and keep it clean. After production, thoroughly clean the concrete remaining in the mixer before stopping the machine, put all the operating switches in the disconnected position after stopping the machine, and turn off the power switches.
Some customers think that forced mixer completion as long as the shutdown on the line, in fact, this idea is wrong, in order to eliminate the
Concrete Mixer safety hazards in a timely manner, to ensure that the mixer state is intact, so after the shutdown should be very good maintenance, in order not to regularly appear some minor problems. Here Zhengzhou Xinfeng machinery technicians tell you only to comply with the reasonable use and maintenance of forced mixer in order to extend the life and let you work at ease to improve efficiency.
Cement Silo Concrete Mixers and batching machinery